PROJECTS
CHANGI AIRPORT T1
Slide title
Write your caption hereButton
DETAILS
The primary civilian airport for Singapore, and one of the largest transportation hubs in Southeast Asia. Singapore Changi Airport has constantly maintain its repute for being one of the best airport in the world.
Client / Consultant
CAG
Completion Date
July 2019
Scope of Work
High Tension (HT) Electrical Distribution Network and Substation for Baggage Handling System (BHS), Low Tension (LT) distribution network, Diesel Operated Generators and Fuel Pumping System, Earthing System, Lightning Protection System, Light Fitting & Lighting Control System, Master Clock System.
The primary civilian airport for Singapore, and one of the largest transportation hubs in Southeast Asia. Singapore Changi Airport has constantly maintain its repute for being one of the best airport in the world.
Client / Consultant
CAG
Completion Date
June 2020
Scope of Work
High Tension (HT) Electrical Distribution Network and Substation for Baggage Handling System (BHS), Low Tension (LT) distribution network, Diesel Operated Generators and Fuel Pumping System, Earthing System, Lightning Protection System, Light Fitting & Lighting Control System, Master Clock System, Energy Monitoring System, etcetera.
JIPCT - Jurong Island Pioneer Cable Tunnel
Slide title
Write your caption hereButtonSlide title
Write your caption hereButtonSlide title
Write your caption hereButtonSlide title
Write your caption hereButtonSlide title
Write your caption hereButtonSlide title
Write your caption hereButton
DETAILS
Located 60 meters below ground level, the Jurong Island to Pioneer Transmission Cable Tunnel (JIPCT) is Singapore’s deepest bored tunnel connecting mainland Singapore to a proposed West Jurong Island 400kV Substation. JICPT carries 400kV and 230kV cable circuits along its 5.2km length, with shafts spaced out at 3 openings (West Jurong Island Shaft, Shipyard Shaft and Benoi Shaft)
Client / Consultant
Penta Ocean
Completion Date
2018
Scope of Work
LV Electrical Distribution Systems, Standby Electricity Supply Systems, Lighting and Small Power Systems, Emergency Lighting Systems, Cabling System for M&E services, Communication system, Security Systems, Supervisory Control and Data Acquisition (SCADA) Interface, Airborne Contaminant Monitoring System, Building Access Control System, Closed Circuit Television, Fence Intrusion Detection System, Duress Alarm System, Security Controller Unit
Located 80 meters below ground level, the Jurong Island to Pioneer Transmission Cable Tunnel (JIPCT) is Singapore’s deepest bored tunnel connecting mainland Singapore to a proposed West Jurong Island 400kV Substation. JICPT carries 400kV and 230kV cable circuits along its 5.2km length, with shafts at spaced out at 3 openings (West Jurong Island Shaft, Shipyard Shaft and Benoi Shaft)
Client / Consultant
Penta Ocean
Completion Date
2018
Scope of Work
LV Electrical Distribution Systems, Standby Electricity Supply Systems, Lighting and Small Power Systems, Emergency Lighting Systems, Cabling System for M&E services, Communication system, Security Systems, Supervisory Control and Data Acquisition (SCADA) Interface, Airborne Contaminant Monitoring System, Building Access Control System, Closed Circuit Television, Fence Intrusion Detection System, Duress Alarm System, Security Controller Unit
CST - Common Services Tunnels
Slide title
Write your caption hereButtonSlide title
Write your caption hereButtonSlide title
Write your caption hereButtonSlide title
Write your caption hereButtonSlide title
Write your caption hereButtonSlide title
Write your caption hereButton
DETAILS
M&E Works (New and A&A projects) Phase 1A, 1B, 2 & 3A ( Year 2000 to 2013) with Marina Bayfront 230KV/22KV Electrical Sub-station.
Client / Consultant
URA
Completion Date
2013
Scope of Work
Entire M&E installation consisting of: Electrical installation High Tension (HT) cables and New Substation, Low Tension (LT) distribution network, Diesel Operated Generators and Fuel Pumping System, Earthing System, Lightning Protection System, Lighting & Lighting Control System, Facility Management System (FMS), CCTV, PA and Access Control System, Wireless Communication System, Addressable Fire Detection System, MV System, Storm Water and Drainage Pumping system
M&E Works (New and A&A projects) Phase 1A, 1B, 2 & 3A ( Year 2000 to 2013) with Marina Bayfront 230KV/22KV Electrical Sub-station.
Client / Consultant
URA
Completion Date
2013
Scope of Work
Entire M&E installation consisting of: Electrical installation [High Tension (HT) Electrical Distribution Network and New Substation, Low Tension (LT) distribution network, Diesel Operated Generators and Fuel Pumping System, Earthing System, Lightning Protection System, Lighting & Lighting Control System], Facility Management System (FMS), CCTV, PA and Access Control System, Wireless Communication System, Addressable Fire Detection System, MV System, Storm Water and Drainage Pumping system
Recreational Facility Relocation
Recreational Facility Relocation
Slide title
Write your caption hereButtonSlide title
Write your caption hereButtonSlide title
Write your caption hereButtonSlide title
Write your caption hereButtonSlide title
Write your caption hereButtonSlide title
Write your caption hereButtonSlide title
Write your caption hereButton
DETAILS
Design and construct a single block of two tier driving range and associated facilities, Electrical Substation, irrigation system, ball stopping high net mast.
Client / Consultant
LTA
Completion Date
Ongoing
Scope of Work
M&E Services including ACMV, Fire Protection and high mast lighting system.
Design and construct a single block of two tier driving range and associated facilities, Electrical Substation, irrigation system, ball stopping high net mast.
Client / Consultant
LTA
Completion Date
Ongoing
Scope of Work
M&E Services including ACMV, Fire Protection and high mast lighting system.
Vehicular Tunnel Lighting system, Electrical installation, Facility Management System (FMS), Storm water Pumping system, Emergency Standby Generator at Vehicular Tunnels
Client / Consultant
LTA
Completion Date
Ongoing
Scope of Work
M&E Services including ACMV, Fire Protection and high mast lighting system.